Call 01444 247192

 
Google Reviews logo

5

Reviews

  • 5  
  • 4  
  • 3  
  • 2  
  • 1  

Last updated: 17.11.18

See all reviews

Sliding Door Gym Combination - 4773

Case study project portfolio > Combination Rooms & Stores > Sliding Door Gym Combination - 4773

Study 4773 - sliding door gym combination with the changing room in Surrey

Comments:
"Best Value, Quality Products, Great Service and Efficient After Sales Care are typically mutually exclusive - generally you can achieve one but not all 4. I am very pleased to say that Martin, Keith and their team achieved all 4 with ease.
I will not hesitate to recommend their timber buildings and we are looking forward to many years of enjoyment out of both buildings."

Sliding door gym combination with the changing room in Surrey

Mr "J" approached us requiring two buildings, the first wanted to be a dedicated office for him to run his company from, the second was to be a combination of a gym with an integrated area potentially be used as a shower room and changing room for the swimming pool and hot tub. After two site surveys and some discussion he agreed with the two quotations.

For the sliding door combination room we installed as steel and timber frame base that was more than 2 m away from the boundary this meant we had more height clearance due to the planning regulations and worked brilliantly with the running machine and cross trainer due to go inside of it. The place was finished off with a small decking area to the front of it .

The customer run his own electrics out to it and included walkover sockets in the floor for the gym equipment. The storage area was set up with two internal doors and one external door, at the time of installation this was left fully open however it was future proofed in case this wanted to be divided off and made into a store and wet room.

The building had our MDF V groove internal painted lining, two internal flush doors all colour matched along with the plum floor. Externally we applied in the factory two coats of Sikkens HLS in walnut. I once the customer had installed his own electrics we then installed climate control.

If you would like more information on this project please call our sales office and quote 4773

Click here to view our Complete Package options

Package & features

  • Sliding door combination bathroom and store
  • Executive Garden Room, with 4.2 UPVC 4 panel sliding
  • MDF Lining, Painted Gadenia walls, white ceiling Vgroove 200
  • 2x Sikkens HLS top coat preservative in walnut
  • 6x12 extention with further 6 ft partition All painted MDF lined
  • 2 extra internal flush doors to access bathroom & store
  • LowE Ultra efficiant glass throughout
  • 2.6 Inverter climate control unit and base
  • Steel and timber framed base, faced off, spoil left on site TBD
  • 6x2 purling for down light
 
 

The Bakers difference

© 2018 Bakers Timber Buildings Ltd. Registered in England and Wales no. 8384038. VAT reg. 155 7432 02.
Covering Brighton, Crawley, Haywards Heath, Croydon, London, Sussex, Surrey, Kent and throughout southeast England and the UK.

 


This website may use cookies to provide an improved experience. You can refuse these cookies by changing your browser settings.
To remove this message, click here to accept cookies.