Scheme Summary

The development consists of eight properties to meet local needs: 2 one bed flats; 2 two bed houses; and 4 three bed houses were built. Completed June 1999.


Scheme Details

The development was constructed on the edge of Maulden village as an exception to planning policy.

Lettings reflect the result of a Parish-wide housing needs survey. They are restricted to residents with a local connection as part of a Section 106 Agreement.

Aragon worked very closely with the local council at all stages of the development, and in particular with regard to the external design and layout to establish a sense of ownership of the properties with the existing community.


Environmental Features

The development achieved the BRE's Environmental Standard Award (now EcoHomes). In order to achieve this, the development needed to minimise its environmental impacts at both a local and global level, whilst promoting a healthy internal environment. The award is judged on a credit system. The following credits were achieved:

Mandatory credits

Optional credits

Global issues and use of resources:

maximum CO2 emissions:

less than 50m2: 31kg/m2/yr
50-100m2: 30kg/m2/yr
more than 100m2: 29kg/m2/yr

all insulation materials with an ozone depletion potential of 0.10 or less

all solid timber from well-managed regulated sources or suitable reused timber

all timber panel products from well managed regulated sources or suitable reused timber

storage containers for recyclable household waste.

Indoor issues:

formaldehyde emissions minimised, timber treated only where necessary and always treated industrially prior to use; no asbestos and no added lead in paint.

Global issues and use of resources:

low energy lighting

provision of gas cooking point

at least 50% recycled or reused materials in walls

Local issues:

WCs with purpose-designed maximum 6 litre flush

rainwater butt

Indoor issues:

material selection criteria acheived

provision of house log book

BS8206: Part 2 Daylight criteria met in kitchen and living rooms.

When designing for energy efficiency Aragon gave consideration to long term value for money issues, particularly taking into account the cost in use by residents and the Association.

The properties have achieved a SAP rating of 80 to 87 due to high insulation levels, highly efficient heating systems and low energy lighting.

All properties are fitted with showers, low volume 6 litre flush WCs and water butts. These measures will reduce water consumption and make savings to annual bills.

As the buildings are well insulated a passive ventilation system was fitted to reduce the risk of condensation and ensure fresh air circulates through the homes. Adjustable air inlets have been fitted to the living and bed rooms. In the bathroom and kitchen, stale moisture-laden air is extracted through outlets to a discreet outside terminal, that acts as an exhaust pipe.

The orientation of the properties maximise solar heat and light gain, reducing energy demands, whilst providing pleasant views to the countryside beyond.


Costs

The Environmental Standard was a new initiative for Aragon. There were concerns that the requirements of the Standard would have an effect on the overall scheme costs. The Standard was also a new concept for the main contractor, and it was thought that this would have an effect on the tender price, particularly since the scheme was to be developed via a Design and Build contract. This was not the case. The total cost was £427,365. Estimates from Aragon's consultant put the additional cost at only £250 per unit. The total scheme costs were 16% below the Housing Corporation's TCI levels.


Developer's Comments

We were pleasantly surprised by our first experience of the Environmental Standard Award. I admit that initially we expected the Standard to be difficult to achieve, and to be particularly costly. However, working closely with our partner contractor and the assessor, we were able to identify the most suitable credits for the scheme with a limited additional cost.

I do think that for all new initiatives to be effective, it is important that they are not too onerous or costly to achieve. This may simply have the effect of putting some RSLs off investigating them further.

We do see environmental sustainability as a high priority for all our developments. The Association is hoping to repeat the success of Redhills Close and incorporate the requirements of the Environmental Standard Award (EcoHomes) on future projects. We are members of the EcoHomes Club recently launched by Baker Homes. Our first development is currently being assessed against the new EcoHomes Standard.